Ir al contenido
Georgia Commons
Menú

Columbus · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 2 - OVERVIEW OF PROJECT CONSTRUCTION

Section 8.2.1. Development Activity.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Preconstruction Activity. Following the issuance of any permit authorizing clearing and grading of a site, areas required to be undisturbed, such as natural buffers or stream greenways, must be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the Department of Engineering prior to the commencement of any clearing or grading activities.

B. Grading.

1. Grading Plan Required. Grading shall be done in accordance with the lines and grades drawn on the approved grading plan.

2. Erosion and Sedimentation Control. Required erosion and sedimentation control measures and stormwater drainage facilities are to be installed in accordance with the approved plans as development progresses.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:columbus-muscogee/zoning/8.2.1@2026-11-11-d23417df7e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Columbus Zoning Ordinance, Section 8.2.1. Development Activity | Georgia Commons