9-1-2. No building permit shall issue for any

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

lot or parcel development requiring a buffer until such time as that buffer, as specified herein, shall be substantially in place or until acceptable surety for the cost of the buffer installation shall be provided to the building inspector. Acceptable surety shall consist either of an irrevocable letter of credit from an

approved lending institution or a performance bond from an approved insurer in an amount not less than $15.00 per linear foot of area to be buffered. The required buffer must be completed and in place within 30 days before any such

surety shall lapse or within six months of the issuance of the building permit,

whichever shall occur sooner.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dalton/zoning/9-1-2@2026-11-11-e8b3db126f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dalton Zoning Ordinance, 9-1-2. No building permit shall issue for any | Georgia Commons