Appendix 5A - URBAN PUD DESIGN STANDARDS / Article IX - BUFFERS

9-1-2. No building permit shall issue for any

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

lot or parcel development requiring a buffer until such time as that buffer, as specified herein, shall be substantially in place or until acceptable surety for the cost of the buffer installation shall be provided to the building inspector. Acceptable surety shall consist either of an irrevocable letter of credit from an

approved lending institution or a performance bond from an approved insurer in an amount not less than $15.00 per linear foot of area to be buffered. The required buffer must be completed and in place within 30 days before any such

surety shall lapse or within six months of the issuance of the building permit,

whichever shall occur sooner.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dalton/zoning/9-1-2@2026-11-11-e8b3db126f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dalton Zoning Ordinance, 9-1-2. No building permit shall issue for any | Georgia Commons