9.3.12. Temporary Dead-End Streets
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Temporary dead-end streets must be provided with a temporary turnaround area which meets the construction requirements for design (sidewalks, curb and gutter not required), maintenance, and removal. If the absence of curb and gutter on a temporary cul-de-sac creates a drainage problem, the subdivider will be required to install appropriate stormwater conveyance devices with concurrence from Hall County Engineering. No lots may be subdivided off any
radius of a temporary turnaround. A performance bond is required, and the cul-de-sac must either be removed and the new phase of construction final platted, or the cul-de-sac must be completed, including sidewalks, and curb and gutter, within 15 months or 75 percent buildout, whichever occurs last, from time of final platting.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.