Skip to content
Georgia Commons
Menu

Hall County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / 9.4 - Street Construction Requirements

9.4.5. Bituminous Plant Mix Paving

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Streets The binder layer of asphalt on streets must be placed before final platting. The final topping will be placed up to one

year after plat approval or at 75 percent build-out.

B. Turn Lanes and Deceleration Lanes Bituminous plant mix paving must consist of a minimum of one and one-quarter

inch asphaltic concrete (Type II 9.5 mm Superpave) placed on top of a minimum of four-inch asphaltic concrete binder (19 mm Superpave). The binder and the

topping layer of asphalt on residential turn lanes and deceleration lanes must be placed before final platting.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/9.4.5@2026-05-28-8fbb43bef5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 9.4.5. Bituminous Plant Mix Paving | Georgia Commons