Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE
9.5.1. Water Systems
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Water systems in subdivisions must meet the following requirements.
A. Public Water Systems All water systems must be designed and built in accordance with the rules and regulations of the territory service provider.
B. Single-Family Residential Subdivision Water Systems
1. All main lines of a community system must be a minimum of 8 inches in diameter. Individual connection must be made to each lot, and pipe sizes for service lines may be no less than three-fourths of an inch in diameter.
2. Systems constructed in subdivisions must have an average pressure of 30 pounds per square inch at each lot and must meet the requirements of Table 9.5.1, Sec. 9.5.2, and the "Standard Construction Practices
for Water and Wastewater Systems, Hall County, Georgia."
3. The system must be designed by an engineer licensed in the State of Georgia.
Table 9.5.1. Instantaneous Water Demands for Single-family Residential Subdivision Water Systems
Total Number of Lots Served GPM per Lot 5 8.0 10 5.0 20 4.3 30 3.8 40 3.4 50 3.0 60 2.7 70 2.5 80 2.2 90 2.1 100 2.0 150 1.6 200 1.3 300 1.2 400 0.9 500 0.8 750 0.7 1,000 0.6 Source: Ameen, Joseph S., Community Water Systems Source Book, p. 50, Technical Proceeding, High Point, N.C., 1965.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.