1016.05. New dams subject to regulation by

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Harris County.

Dams proposed to be 9 feet or more in height, but less than 25 feet in height, in combination with an impounding capacity proposed to be 20 acre-feet or more at maximum water storage elevation, but less than 100 acre-feet, shall be subject to the following:

(a) If the developer elects not to construct the new dam to the design standards for

new dams as contained in the Rules for Dam Safety, then a dam breach analysis for the dam shall be submitted with the construction plans for review and authorization prior to securing a permit from the Community Development

Department. The design engineer shall utilize the computer model entitled "DAMBRK" for the dam breach analysis.

(b) Should the new dam not meet the design standards for new dams as contained in

the Rules for Dam Safety, then only the following uses and structures shall be permitted within the dam breach zone:

(1) Agriculture which requires no structures for human habitation within the dam breach zone including forestry, livestock raising, and agricultural and forestry access

roads.

(2) Fences.

(3) Signs in accordance with Article 6 of this Development Code.

(4) Roads, driveways and parking areas.

(5) Utility poles, towers, pipelines, water treatment outfalls and facilities, or

similar facilities and structures.

(c) If the developer elects to construct the new dam in accordance with the design

standards for new dams as contained in the Rules for Dam Safety, then new development shall be permitted within the dam breach zone. However, the dam shall meet the design standards for new dams as contained in the Rules for Dam Safety if development currently exists or is proposed in the dam breach zone.

(d) Construction plans for new dams defined herein shall be submitted to the Community Development Department for review for the project and the dam prior to securing a permit from the Department.

(e) For any dam that is proposed not to meet the design standards for new dams as

contained in the Rules for Dam Safety, the developer shall obtain a dam breach easement, recorded with the Clerk of Superior Court, from any offsite property owner where it is proposed for the dam

breach zone to extend off the property where the dam is being constructed. The developer shall also cause a dam breach easement to be recorded upon the property being developed.

(f) Prior to recording of a Final Plat or issuance of a Certificate of Occupancy, as appropriate, an as-built certification from a registered professional engineer shall be submitted to the Community Development Department. The certification shall state that the dam is constructed in

accordance with the provisions of these regulations as well as the authorized construction plans. If the project is for the development of a subdivision, the

developer shall also establish a legal entity, acceptable to Harris County, such as a mandatory Homeowners Owner's

Association, at time of recording of the Final Plat, responsible for the

maintenance of the dam and its impoundment.

(g) In addition to State requirements, a new dam shall be on a single parcel of land so that it is owned and maintained by a

single owner or entity.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1016.05@2023-12-05-2f43c8c6d5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1016.05. New dams subject to regulation by | Georgia Commons