Skip to content
Georgia Commons
Menu

Hawkinsville · Zoning Ordinance

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article IV - DEVELOPMENT DESIGN STANDARDS / Division 6 - STORM DRAINAGE

Sec. 4.6.5. Headwalls.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Headwalls are required at the inlet and outlet on all street cross drains and storm drain pipes.

b. Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced concrete with reinforced concrete footings.

c. High water elevation contour is to be based on a twenty-five (25) year storm at the entrance of each head wall.

d. Energy dissipation devices, such as splash pads, riprap, stilling basins, etc., shall be provided at the outlet of every street cross drain and storm drain pipe.

History

The history line the source prints at the end of the section.

(Ord. of 5-10-96)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hawkinsville/zoning/4.6.5@2026-11-11-bba4113097

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hawkinsville Zoning Ordinance, Sec. 4.6.5. Headwalls | Georgia Commons