Hawkinsville · Zoning Ordinance
Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article IV - DEVELOPMENT DESIGN STANDARDS / Division 6 - STORM DRAINAGE
Sec. 4.6.5. Headwalls.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. Headwalls are required at the inlet and outlet on all street cross drains and storm drain pipes.
b. Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced concrete with reinforced concrete footings.
c. High water elevation contour is to be based on a twenty-five (25) year storm at the entrance of each head wall.
d. Energy dissipation devices, such as splash pads, riprap, stilling basins, etc., shall be provided at the outlet of every street cross drain and storm drain pipe.
History
(Ord. of 5-10-96)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.