Hawkinsville · Ordenanza de zonificación
Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article IV - DEVELOPMENT DESIGN STANDARDS / Division 6 - STORM DRAINAGE
Sec. 4.6.5. Headwalls.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Headwalls are required at the inlet and outlet on all street cross drains and storm drain pipes.
b. Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced concrete with reinforced concrete footings.
c. High water elevation contour is to be based on a twenty-five (25) year storm at the entrance of each head wall.
d. Energy dissipation devices, such as splash pads, riprap, stilling basins, etc., shall be provided at the outlet of every street cross drain and storm drain pipe.
Historia
(Ord. of 5-10-96)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.