Hawkinsville · Ordenanza de zonificación
Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article IV - DEVELOPMENT DESIGN STANDARDS / Division 6 - STORM DRAINAGE
Sec. 4.6.4. Piped systems.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Pipe size shall be determined by design runoff and hydraulic capacity. The minimum allowable pipe diameter shall be eighteen (18) inches.
b. Storm drain pipes shall be constructed of Class III reinforced concrete, corrugated aluminum, or bituminous coated corrugated steel. The least expensive materials shall be permitted unless site or other conditions identified by a Professional Engineer dictate otherwise.
c. The design of piped stormwater collection systems shall be based upon conveyance of the peak rate of discharge associated with a 10-year storm.
d. Stormwater pipes that do not carry live streams shall extend at least fifty (50) feet beyond the front building setback lines, and may be required to extend farther where necessary to provide an adequately protected building site on the property.
e. Any storm drainage pipe that extends outside of the street right-of-way shall be located within a twenty (20) foot wide easement.
f. All storm drainage pipes shall be at least eighteen (18) inches below the surface and shall have a slope of at least one percent.
g. Pipe bedding shall be provided as specified in "Design and Construction of Sanitary and Storm Sewers," prepared by the American Society of Civil Engineers (Manuals and Reports on Engineering Practice No. 37), latest edition.
Historia
(Ord. of 5-10-96)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.