Sec. 113-142. Underground utilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(1) Utilities within the roadway.

a. All water and sanitary sewer utilities and storm drain facilities within the roadway shall be installed and the ditches backfilled and thoroughly compacted before any pavement or base is installed.

b. All utility installations shall comply with applicable local, state and federal requirements for erosion and sediment control.

(2) Installation of utilities after the placement of base material.Once the base has been placed, proof-rolled and approved for paving all further installation of utilities under the roadway shall be bored or other wise comply with section 113-147, street cuts.

(3) Manholes, valve boxes, etc. within the road section. All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section.

History

The history line the source prints at the end of the section.

(Ord. No. 2009-06-18, (12.2), 6-29-2009)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:johns-creek/zoning/113-142@2026-11-11-a08e25cad3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Johns Creek Zoning Ordinance, Sec. 113-142. Underground utilities | Georgia Commons