Skip to content
Georgia Commons
Menu

Lee County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article XI - SANITARY SEWAGE REQUIREMENTS / Division 1 - GENERALLY

Sec. 38-482. Sewerage system design criteria.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Sanitary sewer stub-outs shall be provided for each development lot and shall extend from the sewer line to the property line if public sanitary sewer service is provided in the development.

(b) No sanitary sewer shall be allowed to connect to any storm drainage pipes or systems.

(c) Sanitary sewer velocities shall be sufficient to prevent deposition, yet not high enough to cause separation or cause erosive damage to the pipe. In order to accomplish this sewers shall be sloped to achieve a minimum velocity of two feet per second when the conduit is flowing half full. The slope shall also be designed so that the velocity will not exceed ten feet per second. The required slope to achieve minimum velocity (n = 0.13) shall be:

Pipe size (inches) Slope (foot/100 feet) 8 0.40 10 0.28 12 0.22 15 0.15 18 0.12 21 0.10 24 0.08 27 0.07 30 0.06

(d) Infiltration into the sewer shall not exceed 200 gallons per minute per mile of sewer per inch of inside diameter of pipe per 24 hours in any section between successive manholes. In areas where the seasonal or normal groundwater is above the top of the pipe, the plans are to be noted as such and special conditions may be placed on those pipes.

History

The history line the source prints at the end of the section.

(Ord. of 9-18-00(2), § 38-482)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/zoning/38-482@2026-06-23-4bd6d3e609

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Zoning Ordinance, Sec. 38-482. Sewerage system design criteria | Georgia Commons