Leesburg · Zoning Ordinance
Appendix C - LAND DEVELOPMENT REGULATIONS / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 2 - GENERAL CONSTRUCTION STANDARDS AND SPECIFICATIONS
Sec. 5.15. Route clearing.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The extent of route clearing required is that minimum degree of clearing necessary to install utilities and appurtenances, and such additional clearing as shown on the drawings.
(a) Clearing.
(1) Remove above-grade structures only where specifically authorized.
(2) Remove abandoned underground facilities such as utilities and structures, walls, footings, basements, wells, septic tanks, tanks, underground pipe, and other items which conflict with construction.
(b) Holes and depressions.
(1) Fill holes, depressions and voids created or exposed by clearing operations with non-organic soil material, unless further excavation earth work is indicated.
(2) Place fill material in horizontal layers not exceeding six inches loose depth and thoroughly compact to a density at least equal to adjacent ground.
(c) Disposal of waste material.
(1) Dispose of all material in accordance with all local, state and federal laws, rules and regulations.
(2) Burning of cleared materials on the work site is only permitted when authorized by the Forestry Service.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.