Tybee Island · Zoning Ordinance
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-240. Description.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
This division addresses post-construction stormwater management in Georgia's Coastal Nonpoint Source Management Area. This division establishes requirements for stormwater plans that are to be submitted before land development commences. The plans document how post-construction stormwater runoff quality and quantity will be effectively managed according to performance criteria described in this division. Guidelines for inspection, maintenance, and violations are also included. This division is linked with existing stormwater management
manuals including the Georgia Stormwater Management Manual, the Coastal Stormwater Supplement and local design manuals that provide the technical specifications for stormwater system design.
History
(Ord. No. 42-2014, § 1, 10-10-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.