Ir al contenido
Georgia Commons
Menú

Tybee Island · Ordenanza de zonificación

Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT

Sec. 16-240. Description.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

This division addresses post-construction stormwater management in Georgia's Coastal Nonpoint Source Management Area. This division establishes requirements for stormwater plans that are to be submitted before land development commences. The plans document how post-construction stormwater runoff quality and quantity will be effectively managed according to performance criteria described in this division. Guidelines for inspection, maintenance, and violations are also included. This division is linked with existing stormwater management

manuals including the Georgia Stormwater Management Manual, the Coastal Stormwater Supplement and local design manuals that provide the technical specifications for stormwater system design.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 42-2014, § 1, 10-10-2014)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:tybee-island/zoning/16-240@2026-11-11-8a215135cf

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Tybee Island Zoning Ordinance, Sec. 16-240. Description | Georgia Commons