Tybee Island · Zoning Ordinance
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-550. Final inspection and as built plans.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Subsequent to the final installation and stabilization of all permanent stormwater management practices shown on the approved stormwater management design plan and before the issuance of a certificate of occupancy the applicant is responsible for certifying that the project
has been completed in accordance with the approved stormwater management design plan and submitting "as built" plans for all permanent stormwater management practices shown on the approved stormwater management design plan. The "as built" plans must show the final design specifications for all structural and nonstructural stormwater management practices and must be certified by a licensed landscape architect, professional surveyor, or professional engineer. A final inspection shall be conducted by the staff or representatives of the city to confirm the accuracy of the "as built" plans. A final inspection is required before any performance bond or other guarantee can be released.
History
(Ord. No. 42-2014, § 1, 10-10-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.