Cobb County · Code of Ordinances
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 2 - STORMWATER CONCEPT AND DESIGN PLANS
Sec. 50-126.1. Pre-submittal meeting.
About this text
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and
inventory (GSMM section 2.4.2.4) or the stormwater concept plan (GSMM section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed
plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division when applying for a determination of infeasibility through the practicability policy.
History
(Amd. of 2-9-21)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.