Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 2 - STORMWATER CONCEPT AND DESIGN PLANS
Sec. 50-126.1. Pre-submittal meeting.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and
inventory (GSMM section 2.4.2.4) or the stormwater concept plan (GSMM section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed
plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the Cobb County Water System Stormwater Management Division when applying for a determination of infeasibility through the practicability policy.
Historia
(Amd. of 2-9-21)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.