Skip to content
Georgia Commons
Menu

Jefferson County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article II - FLOOD PREVENTION AND CONTROL / Division 4 - STANDARDS, SPECIFICATIONS AND REGULATIONS

Sec. 16-98. New construction and substantial improvements.

About this text

  • As published by Municode, current through 2024-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

For new construction and substantial improvement in all areas of special flood hazard, the following standards shall apply:

(1) Where base flood elevation data are available, new construction or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation.

(2) Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 16-93.

(3) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.

History

The history line the source prints at the end of the section.

(Ord. No. 001-10, art. 4, § B(1), 8-10-2010)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jefferson-county/code/16-98@2024-07-09-9400c22ff0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.