Monroe County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENT / Article II - SOLAR ENERGY FARMS
Sec. 6.5-60. [Completion of application.]
About this text
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The following information shall be submitted for an application to be considered complete:
(1) A descriptive site plan including setbacks, panel sizes, locations of property lines, building, and road right of ways;
(2) Landscaping plan to scale indicating size, spacing and type of fence, shrubbery,
trees or earthen berm as required by section 6.5-57;
(3) A description of the anticipated maintenance needs for the solar energy farm, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance;
(4) A utilities inventor showing the locations of all water, sewage, drainage, and power line easements impacting the proposed
site.
(5) Relevant studies, reports, certificates and approvals as may be reasonably requested by the department, including but not
limited to design review;
(6) A storm water management study shall be provided to ensure compliance with
local BMP's; and
(7) Before any construction can commence on any solar energy system, the property owner must acknowledge, in writing to
the board of commissioners that he/she is the responsible party for owning and
maintaining the solar energy system.
History
(Ord. of 4-1-2014)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.