Monroe County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENT / Article II - SOLAR ENERGY FARMS
Sec. 6.5-60. [Completion of application.]
Sobre este texto
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following information shall be submitted for an application to be considered complete:
(1) A descriptive site plan including setbacks, panel sizes, locations of property lines, building, and road right of ways;
(2) Landscaping plan to scale indicating size, spacing and type of fence, shrubbery,
trees or earthen berm as required by section 6.5-57;
(3) A description of the anticipated maintenance needs for the solar energy farm, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance;
(4) A utilities inventor showing the locations of all water, sewage, drainage, and power line easements impacting the proposed
site.
(5) Relevant studies, reports, certificates and approvals as may be reasonably requested by the department, including but not
limited to design review;
(6) A storm water management study shall be provided to ensure compliance with
local BMP's; and
(7) Before any construction can commence on any solar energy system, the property owner must acknowledge, in writing to
the board of commissioners that he/she is the responsible party for owning and
maintaining the solar energy system.
Historia
(Ord. of 4-1-2014)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.