Oconee County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION
Sec. 1017. Where underground piping parallels the roadway the excavated ditch edge nearest the pavement will be at least eight feet from the pavement edge, unless otherwise authorized herein.
About this text
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(5) The facility trench shall be backfilled carefully after the facility has been installed, in accordance with the standard practice for installing culverts and minor structures. In crossing roadways the backfill will be made in six-inch layers and each layer firmly compacted. Where roadway grass is disturbed, satisfactory replacement will be accomplished including adequate seeding of new grass.
(6) The full and entire expense and cost of the facility installation and maintenance shall be borne by the utility owner and the utility owner shall make necessary arrangements for traffic over said point during such work as may be directed by the Public Works Director. The utility owner shall place the necessary barricades, warning signs, signals, lights and, if necessary, watchmen for the protection of the traveling public, and further agrees by the acceptance of the permit to keep and hold Oconee County harmless from any and all damages caused by negligence on the part of the utility owner, its agents, servants, officers or employees, or contractors, engaged in doing said work, or any injuries or damages suffered by anyone as a result thereof.
d. Future relocations at utility expense. In case the Board of Commissioners should in the future decide to widen and/or relocate the existing road, the Oconee County Commissioners reserve the right to require the utility owner to take up and relay such sections of the facility within the right-of-way as may be necessary to take up and relay from an engineering standpoint due to such widening and/or relocating; the taking up and relaying to be at the expense of the utility owner. This work shall be completed within 60 working days after notification by the Board of Commissioners or within such other time as may be approved in writing by the Public Works Director or designated representative of the Board of Commissioners.