  1. Sec. 1018. Overview—project construction
  2. Sec. 1018.01. Responsibility during construction
  3. Sec. 1018.02. Development phase inspections
  4. Sec. 1018.03. As-built data
  5. Sec. 1018.04. Final development inspection
  6. Sec. 1019. Site clearing and grading
  7. Sec. 1019.01. Initiation of clearing and grading activities
  8. Sec. 1019.02. Slopes
  9. Sec. 1020.01. Definitions related to excavating and trenching
  10. Sec. 1020.02. Unauthorized excavating and trenching prohibited
  11. Sec. 1020.03. Adoption of OSHA safety and health regulations
  12. Sec. 1020.04. Excavation and trenching certificate required
  13. Sec. 1020.05. Permit required
  14. Sec. 1020.06. Enforcement of excavating and trenching requirements
  15. Sec. 1020.07. Inspection by Oconee County
  16. Sec. 1020.08. Violations
  17. Sec. 1021.01. Permit for utility installation
  18. Sec. 1017. Where underground piping parallels the roadway the excavated ditch edge nearest the pavement will be at least eight feet from the pavement edge, unless otherwise authorized herein
  19. Sec. 1021.02. Additional design & construction considerations
  20. Sec. 1021.03. Installation of utilities; general
  21. Sec. 1021.04. Slopes and shoulder improvements
  22. Sec. 1021.05. Construction methods; roadways
  23. Sec. 1022.01. Building permit required
  24. Sec. 1022.02. Building site development