Sec. 1021.03. Installation of utilities; general.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus two feet of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Sec. 1017. The developer shall coordinate the location of all utilities and provide a copy of all as-built and proposed locations at final plat.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1021.03@2026-04-07-abdbe8c38c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.