Sec. 1021.03. Installation of utilities; general.
Sobre este texto
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus two feet of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Sec. 1017. The developer shall coordinate the location of all utilities and provide a copy of all as-built and proposed locations at final plat.