Skip to content
Georgia Commons
Menu

Paulding County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 62 - ROADS / Article II - UTILITY INSTALLATION IN OR ALONG PUBLIC WAYS

Sec. 62-34. Placement of utilities on existing street.

About this text

  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Any person desiring to install a utility within a public way shall submit design drawings and specifications to the county for review and approval. At a minimum, the following guidelines apply to all installations permitted hereunder.

(1) As the county intends for all roads or streets to have a pavement width of at least 24 feet, all utility placements should be placed with the future edge of pavement starting at least 12 feet off the centerline.

(2) All utility installations shall be located close to the rear edge of the right-of-way of the public way.

(3) No utility installations shall include parallel lines, unless the parallel lines are within the same ditch. Should a new line be required, the removal and/or abandonment of the existing lines shall be mandatory.

(4) Utility placements on unimproved county roads are subject to relocation and removal upon the improvement or alteration of the public way.

History

The history line the source prints at the end of the section.

(Code 1987, § 17-5; Res. No. 98-30, § C(2), 12-8-1998)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:paulding-county/code/62-34@2025-12-09-e2c6f79994

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Paulding County Code of Ordinances, Sec. 62-34. Placement of utilities on existing street | Georgia Commons