Skip to content
Georgia Commons
Menu

Pulaski County · Code of Ordinances

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.2.8.1. Materials.

About this text

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Pipe materials shall be determined based on type of installation, as set forth in "Selection Guidelines for Storm Sewer Piping", incorporated herein. All pipe shall be new and unused.

The gauge or class of pipe used shall be determined by acceptable methods using H-20 highway loading, and shall meet GADOT specifications. The County Roads Superintendent or his/her duly appointed representative shall inspect the pipe before installation to assure that it is free of cracks or damage. All damaged, used, or "second" quality used pipe shall be refused and immediately removed from the job site.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pulaski-county/code/5.2.8.1@2023-06-05-dbc4e8a0c1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pulaski County Code of Ordinances, Section 5.2.8.1. Materials | Georgia Commons