Skip to content
Georgia Commons
Menu

Pulaski County · Code of Ordinances

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.2.8.2. Joints and Installation.

About this text

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Reinforced concrete pipe joints must be properly constructed, to prevent exfiltration. The use of O-rings or sealants may be required, depending on pipe design. All storm sewer piping shall be constructed in a linear approach, with no vertical or horizontal variance from the approved design.

High-density polyethylene (HDPE) and corrugated metal pipe (CMP) shall be joined by manufacturer's recommended pipe banding materials. All trench lines shall be thoroughly compacted, prior to pipe installation. HDPE pipe will require special bedding and installation as directed by the County Roads Superintendent.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pulaski-county/code/5.2.8.2@2023-06-05-f8920eb456

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pulaski County Code of Ordinances, Section 5.2.8.2. Joints and Installation | Georgia Commons