Ir al contenido
Georgia Commons
Menú

Pulaski County · Código de ordenanzas

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.2.8.2. Joints and Installation.

Sobre este texto

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Reinforced concrete pipe joints must be properly constructed, to prevent exfiltration. The use of O-rings or sealants may be required, depending on pipe design. All storm sewer piping shall be constructed in a linear approach, with no vertical or horizontal variance from the approved design.

High-density polyethylene (HDPE) and corrugated metal pipe (CMP) shall be joined by manufacturer's recommended pipe banding materials. All trench lines shall be thoroughly compacted, prior to pipe installation. HDPE pipe will require special bedding and installation as directed by the County Roads Superintendent.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pulaski-county/code/5.2.8.2@2023-06-05-f8920eb456

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.