Rockdale County · Code of Ordinances
Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 4 - GENERAL USE OF PUBLIC WASTEWATER FACILITIES
Sec. 98-143. Master plan.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A master plan for wastewater facilities shall be prepared by Rockdale Water Resources. Such master plan shall be reviewed and comprehensively updated as circumstances require or as directed by the director. Projected flows and recommendations contained in the master plan shall be consistent with the county comprehensive land use plan, available and accurate regional forecasts of population and employment, and any project specific information which is available at the time the plan is developed or updated. Water resources shall
periodically compare flows being treated at the wastewater treatment facilities with the permitted capacities of the treatment facilities and shall project flows in each drainage basin over
the following ten-year period. When these projections indicate that total flow will likely equal or exceed 85 percent of total authorized flow within
the following five years, water resources shall prepare and submit to the board of commissioners for their review and action recommendations for expansion, and a detailed schedule including
planning, design, permitting, construction and startup of needed proposed facilities.
History
(Ord. No. 2007-07, § 1, 3-27-2007)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.