Rockdale County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 4 - GENERAL USE OF PUBLIC WASTEWATER FACILITIES
Sec. 98-143. Master plan.
Sobre este texto
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A master plan for wastewater facilities shall be prepared by Rockdale Water Resources. Such master plan shall be reviewed and comprehensively updated as circumstances require or as directed by the director. Projected flows and recommendations contained in the master plan shall be consistent with the county comprehensive land use plan, available and accurate regional forecasts of population and employment, and any project specific information which is available at the time the plan is developed or updated. Water resources shall
periodically compare flows being treated at the wastewater treatment facilities with the permitted capacities of the treatment facilities and shall project flows in each drainage basin over
the following ten-year period. When these projections indicate that total flow will likely equal or exceed 85 percent of total authorized flow within
the following five years, water resources shall prepare and submit to the board of commissioners for their review and action recommendations for expansion, and a detailed schedule including
planning, design, permitting, construction and startup of needed proposed facilities.
Historia
(Ord. No. 2007-07, § 1, 3-27-2007)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.