Sec. 98-89. Wastewater service connection restrictions.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Notwithstanding any other provision in this chapter or the UDO to the contrary, each of the following restrictions shall apply to wastewater connection permits:
(1) No preliminary subdivision plat, land disturbance permit, building permit or
other permit, for any use, project or development that requires or will require wastewater service shall be authorized
or issued unless a wastewater connection permit specific to the use, project or
development has been issued and validated by Rockdale Water Resources.
(2) All wastewater service connections shall require a two-step process. First, the
entire wastewater connection permit application process shall be followed, including adherence to all procedures in this chapter, assignment of a wastewater allocation, and payment of all required
fees and charges, including but not limited to the CCR. Second, the wastewater connection permit shall be validated by an authorized representative of the Rockdale Water Resources engineering division in the manner set forth in this article.
(3) Wastewater connection permits shall be strictly limited to the project identified on the face of said permit. Wastewater
connection permits shall also be limited by all other restrictions associated
therewith, including all time limitations.
(4) Wastewater connection permits shall not be transferred to any other location, use, or project.
(5) Wastewater connection permits shall be subject to all of the conditions on the face of the permit as well as all other restrictions found in this chapter 98.
(6) No wastewater connection permit shall be valid, and no property interest, vested right, or reliance of any kind shall in any way be associated with either said permit or the procedures for securing said permit set forth in this article, until said permit has been properly validated by Rockdale
Water Resources. No rights whatsoever to connect to the wastewater system exist until a properly validated wastewater connection permit has been issued.
History
(Ord. No. 2007-07, § 1, 3-27-2007)