Ir al contenido
Georgia Commons
Menú

Rockdale County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 2 - WASTEWATER APPLICATION AND CONNECTION PROCESS; FEES AND RELATED CHARGES

Sec. 98-89. Wastewater service connection restrictions.

Sobre este texto

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Notwithstanding any other provision in this chapter or the UDO to the contrary, each of the following restrictions shall apply to wastewater connection permits:

(1) No preliminary subdivision plat, land disturbance permit, building permit or

other permit, for any use, project or development that requires or will require wastewater service shall be authorized

or issued unless a wastewater connection permit specific to the use, project or

development has been issued and validated by Rockdale Water Resources.

(2) All wastewater service connections shall require a two-step process. First, the

entire wastewater connection permit application process shall be followed, including adherence to all procedures in this chapter, assignment of a wastewater allocation, and payment of all required

fees and charges, including but not limited to the CCR. Second, the wastewater connection permit shall be validated by an authorized representative of the Rockdale Water Resources engineering division in the manner set forth in this article.

(3) Wastewater connection permits shall be strictly limited to the project identified on the face of said permit. Wastewater

connection permits shall also be limited by all other restrictions associated

therewith, including all time limitations.

(4) Wastewater connection permits shall not be transferred to any other location, use, or project.

(5) Wastewater connection permits shall be subject to all of the conditions on the face of the permit as well as all other restrictions found in this chapter 98.

(6) No wastewater connection permit shall be valid, and no property interest, vested right, or reliance of any kind shall in any way be associated with either said permit or the procedures for securing said permit set forth in this article, until said permit has been properly validated by Rockdale

Water Resources. No rights whatsoever to connect to the wastewater system exist until a properly validated wastewater connection permit has been issued.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2007-07, § 1, 3-27-2007)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rockdale-county/code/98-89@2026-01-27-0dae6551bc

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rockdale County Code of Ordinances, Sec. 98-89. Wastewater service connection restrictions | Georgia Commons