Sec. 98-90. Wastewater permit authorization when no availability exists.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Except as authorized in subsection (b), no domestic or nondomestic wastewater connection permit shall be issued unless wastewater plant availability or wastewater system availability, as defined in section 98-20, exist.
If wastewater plant availability does not exist then that particular plant can only accept wastewater and issue connection permits under restricted conditions, pursuant to subsection (b).
Restriction of plant capacity when no plant availability exists is required to ensure that the critical needs and the best interest of Rockdale County are addressed during the period required to reduce the wastewater treatment plant's capacity utilization to less than 95.00 percent. Once the wastewater treatment plant's capacity utilization is less than 95.00 percent of its authorized flow, provided that the remaining wastewater
treatment plant system's authorized flow is at least 50,000 GPD, then the restrictions shall be removed and sewer connection permits made available to the general public.
If wastewater plant availability does not exist for two or more plants within the same wastewater treatment plant system, then the total available flow capacity within the county wastewater system must be evaluated to determine whether wastewater system availability exists.
(b) If wastewater plant availability or wastewater system availability does not exist, the director may authorize wastewater connection permits only for the following categories of users, subject to the restrictions listed below:
development authorities located in Rockdale County or the City of Conyers; the ConyersRockdale Economic Development Authority; the Rockdale County Community Revitalization and
Improvement Program; Rockdale County Sewer Relief and Residential Construction Support Program, which shall be used to provide sewer service to residential users with failing septic tank systems that cannot be feasibly repaired as determined by the county's health department, and, for new individual single-family detached residential users.
Under no circumstances shall wastewater connection permits authorized by this subsection result in a condition in which remaining system
authorized flow within a wastewater treatment plant system is 50,000 GPD or less.
When no wastewater system availability exists, the following restrictions and allocation plans shall also apply to the remaining five percent of the county wastewater system's total capacity:
(1) Requests for wastewater connection permits authorized by this subsection shall not exceed five percent of the total remaining flow capacity within the county wastewater system, which includes the required capacity reservation of 50,000
GPD.
(2) Requests for wastewater connection permits by the Rockdale County Community Revitalization and Improvement Program shall be limited to 23 percent of
the remaining five percent of the county wastewater system's total capacity.
(3) Requests for wastewater connection permits from the Rockdale County Sewer Relief and Residential Construction Support Program shall be limited to one percent of the remaining five percent of
the county wastewater system's total capacity.
(4) Requests for wastewater connection permits from the Conyers-Rockdale Economic Development Authority shall not exceed 51 percent of the remaining five percent of the county wastewater system's total capacity.
(c) Requests for wastewater connection permits by a development authority identified in subsection (b) shall be subject to each of the following:
(1) Said requests shall be approved only by an intergovernmental agreement, which agreement may address connection to the county wastewater and water systems, CCR charges and other cost recovery fees, and other provisions to adequately protect the best interest of the water and wastewater systems;
(2) Said requests shall be accompanied by a resolution of the authority authorizing the request and certifying that the request is necessary to achieve unique and extraordinary revitalization, development or redevelopment within its jurisdiction consistent with all state and local laws applicable to the authority; and
(3) Said requests shall not exceed 20,000 GPD per development authority.
All requests for wastewater connection permits under subsection (b) shall adhere to the application and review requirements of this chapter, including article III and the connection requirements set
forth in article I, except as otherwise provided in an intergovernmental agreement under subsection (c)(1). No wastewater connection permits shall be
issued if any portion of the property subject to the requested permit is located within the areas designated to be served by septic systems only in the Rockdale County Water and Wastewater Master Plan.
(Ord. No. 2007-07, § 1, 3-27-2007; Ord. No.
0-2007-18, § 1, 9-25-2007; Ord. No. 2017-09, §§ 1, 2, 5-23-2017)