Skip to content
Georgia Commons
Menu

Tattnall County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 68 - SUBDIVISIONS / Article III - SUBDIVISION DESIGN AND SPECIFICATIONS

Sec. 68-45. Drainage.

About this text

  • As published by Municode, current through 2025-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) For minor subdivisions: All roads must be brought up to an elevation at least 12 inches above the 100 year flood plain, be equipped with proper drainage pipes, including driveway and ramp pipes, and have drainage easements and out-fall ditches as needed. All cross drains shall contain a minimum of 32 feet of approved pipe of a size sufficient to provide for proper drainage. All drainage pipes must be concrete or double wall ADS. The county engineer must approve road elevations, drainage plan, drainage structures, cross drains and out-fall ditches before installation.

(b) For major subdivisions: All roads and lots must be brought up to an elevation at least 12 inches above the 100 year flood plain. All roads must be equipped with proper drainage structures, including storm drains. Drainage easements, retention ponds, and outfall ditches should be in place if necessary. The county engineer must approve road elevations, drainage plan, and drainage structures before installation.

History

The history line the source prints at the end of the section.

(Ord. of 9-8-2014, art. IV, § 4.5)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:tattnall-county/code/68-45@2025-04-07-659cbc95f9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.