8.19. As-Built Data
About this text
- As posted on the city's website, retrieved 2026-11-11
A. Upon completion of the development activity as authorized by the development permit and prior to final inspection, the owner must submit to the Town Engineer for review and approval a complete set of record drawings showing "as-built" conditions prepared by the design professional of record who prepared the original plans, or a professional land surveyor, engineer, or landscape architect licensed in the State of Georgia. These
drawings must show the following:
1. Street centerlines and rights-of-way lines.
2. Drainage system pipes, manholes and channels, including finished elevations.
3. Storm water detention facilities including finished elevations.
4. Sanitary sewer system (if any) including finished elevations.
5. Water system and reuse water system (if any) including finished elevations.
6. All other information as required by the Town Engineer.
B. The as-built data must be certified and sealed by the design professional of record or other professional preparer, subject to the
tolerances of accuracy indicated in the certification.
Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.