Sec. 109-334. Utilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The gas system and any other underground utilities system when it is to be installed in a subdivision or land development shall be installed along with service connections before any paving is laid. All utility facilities, including but

not limited to gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development.

Whenever existing utility facilities are located above ground, except when existing on public roads and rights-of-way, they shall be removed and placed underground.

History

The history line the source prints at the end of the section.

(Ord. of 2-18-2003, § 806)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cumming/zoning/109-334@2026-11-11-c7c1e256b2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cumming Zoning Ordinance, Sec. 109-334. Utilities | Georgia Commons