Ir al contenido
Georgia Commons
Menú

Cumming · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article IV - DESIGN REQUIREMENTS / Division 5 - EASEMENTS AND UTILITIES

Sec. 109-334. Utilities.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The gas system and any other underground utilities system when it is to be installed in a subdivision or land development shall be installed along with service connections before any paving is laid. All utility facilities, including but

not limited to gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development.

Whenever existing utility facilities are located above ground, except when existing on public roads and rights-of-way, they shall be removed and placed underground.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 2-18-2003, § 806)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cumming/zoning/109-334@2026-11-11-c7c1e256b2

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.