Skip to content
Georgia Commons
Menu

Flowery Branch · Zoning Ordinance

Appendix C - ZONING ORDINANCE / Article 32 - FLOODPLAIN MANAGEMENT

Sec. 32.27. Engineering Study Required for Floodplain Encroachments.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb

any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations

and/or floodways for which the provisions this Article shall otherwise apply.

(b) This study shall be prepared by a currently registered Professional Engineer in the State of Georgia and made a part of the application for a permit.

(c) This information shall be submitted to and approved by the Zoning Administrator prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain.

History

The history line the source prints at the end of the section.

(Ord. No. 578, § 1, 8-1-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:flowery-branch/zoning/32.27@2026-11-11-1862ac9e4d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Flowery Branch Zoning Ordinance, Sec. 32.27. Engineering Study Required for Floodplain Encroachments | Georgia Commons