Ir al contenido
Georgia Commons
Menú

Flowery Branch · Ordenanza de zonificación

Appendix C - ZONING ORDINANCE / Article 32 - FLOODPLAIN MANAGEMENT

Sec. 32.27. Engineering Study Required for Floodplain Encroachments.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb

any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations

and/or floodways for which the provisions this Article shall otherwise apply.

(b) This study shall be prepared by a currently registered Professional Engineer in the State of Georgia and made a part of the application for a permit.

(c) This information shall be submitted to and approved by the Zoning Administrator prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 578, § 1, 8-1-2019)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:flowery-branch/zoning/32.27@2026-11-11-1862ac9e4d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Flowery Branch Zoning Ordinance, Sec. 32.27. Engineering Study Required for Floodplain Encroachments | Georgia Commons