Flowery Branch · Ordenanza de zonificación
Appendix C - ZONING ORDINANCE / Article 32 - FLOODPLAIN MANAGEMENT
Sec. 32.28. Engineering Study Specifications.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
An engineering study required for floodplain encroachments shall include the following:
(a) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;
(b) Step-backwater analysis, using a FEMAapproved methodology approved by the ZoningAdministrator. Cross-sections (which may be supplemented by the applicant) and flow
information will be obtained whenever available. Computations will be shown duplicating Flood Insurance Study results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;
(c) Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development;
(d) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.
Historia
(Ord. No. 578, § 1, 8-1-2019)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.