Skip to content
Georgia Commons
Menu

Tybee Island · Zoning Ordinance

Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT

Sec. 16-460. Groundwater recharge.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Groundwater recharge shall be preserved on a development or redevelopment site in order to preserve and/or replicate pre-development site hydrology, recharge shallow groundwater aquifers, and promote baseflow to on-site and downstream aquatic resources. A stormwater management system complies with this requirement if it provides groundwater recharge in

accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement.

The prescribed groundwater recharge volume on a development or redevelopment site, as defined in the latest edition of the Coastal Stormwater Supplement, shall be considered part of the runoff reduction volume defined in section 16-430, and shall not be managed in addition to the prescribed runoff reduction volume. Green infrastructure, which includes better site planning and design techniques and low impact development practices, shall be used to the maximum extent practical during the site planning and design process to preserve groundwater recharge on a development or redevelopment site.

History

The history line the source prints at the end of the section.

(Ord. No. 42-2014, § 1, 10-10-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:tybee-island/zoning/16-460@2026-11-11-cac4b672e2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.