Tybee Island · Ordenanza de zonificación
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-460. Groundwater recharge.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Groundwater recharge shall be preserved on a development or redevelopment site in order to preserve and/or replicate pre-development site hydrology, recharge shallow groundwater aquifers, and promote baseflow to on-site and downstream aquatic resources. A stormwater management system complies with this requirement if it provides groundwater recharge in
accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement.
The prescribed groundwater recharge volume on a development or redevelopment site, as defined in the latest edition of the Coastal Stormwater Supplement, shall be considered part of the runoff reduction volume defined in section 16-430, and shall not be managed in addition to the prescribed runoff reduction volume. Green infrastructure, which includes better site planning and design techniques and low impact development practices, shall be used to the maximum extent practical during the site planning and design process to preserve groundwater recharge on a development or redevelopment site.
Historia
(Ord. No. 42-2014, § 1, 10-10-2014)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.