Tybee Island · Ordenanza de zonificación
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-470. Overbank flood protection.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All stormwater management systems shall be designed to control the post-development peak discharge generated by the overbank flood protection storm event, as defined in the latest edition of the Coastal Stormwater Supplement, to prevent an increase in the frequency and magnitude of damaging overbank flooding. A stormwater management system complies with this requirement if:
(1) It provides overbank flood protection in accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement; and
(2) Appropriate structural and nonstructural stormwater management practices have been selected, designed, constructed, and maintained in accordance with the standards, criteria, and information presented in the latest edition of the Coastal Stormwater Supplement and any relevant local addenda.
Historia
(Ord. No. 42-2014, § 1, 10-10-2014)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.