Skip to content
Georgia Commons
Menu

Tybee Island · Zoning Ordinance

Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT

Sec. 16-470. Overbank flood protection.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All stormwater management systems shall be designed to control the post-development peak discharge generated by the overbank flood protection storm event, as defined in the latest edition of the Coastal Stormwater Supplement, to prevent an increase in the frequency and magnitude of damaging overbank flooding. A stormwater management system complies with this requirement if:

(1) It provides overbank flood protection in accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement; and

(2) Appropriate structural and nonstructural stormwater management practices have been selected, designed, constructed, and maintained in accordance with the standards, criteria, and information presented in the latest edition of the Coastal Stormwater Supplement and any relevant local addenda.

History

The history line the source prints at the end of the section.

(Ord. No. 42-2014, § 1, 10-10-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:tybee-island/zoning/16-470@2026-11-11-417469b02f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Tybee Island Zoning Ordinance, Sec. 16-470. Overbank flood protection | Georgia Commons