3.1. Conveyance Structures.

About this text

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

3.1.1. Pipes within the Whitfield County right-of-way (including City of Tunnel Hill and City of Varnell).

All pipes located under roadways and within the public right-of-way of Whitfield County, and that are accepted by the county engineer for long-term maintenance, shall be constructed of reinforced concrete pipe (RCP) meeting Georgia Department of Transportation Standards.

All pipes must have a minimum of 12 inches of cover from the exterior crown of the pipe, and in accordance with manufacturer's specifications. Pipes under pavement must have a minimum of 12 inches of cover from the exterior crown of the pipe to the bottom of the roadway base. Pipes must have at least 6 inches of clearance between the exterior of the pipe and all underground utilities.

In situations where the county engineer has reason to suspect that a pipe system may have not been installed properly, the county engineer may require at his discretion, video inspections of pipe systems to be provided at the owner's expense prior to acceptance of the system.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:whitfield-county/zoning/3.1@2026-05-11-41674acb2f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.