Ir al contenido
Georgia Commons
Menú

Whitfield County · Ordenanza de zonificación

Appendix C - STORMWATER LOCAL DESIGN MANUAL

3.1. Conveyance Structures.

Sobre este texto

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

3.1.1. Pipes within the Whitfield County right-of-way (including City of Tunnel Hill and City of Varnell).

All pipes located under roadways and within the public right-of-way of Whitfield County, and that are accepted by the county engineer for long-term maintenance, shall be constructed of reinforced concrete pipe (RCP) meeting Georgia Department of Transportation Standards.

All pipes must have a minimum of 12 inches of cover from the exterior crown of the pipe, and in accordance with manufacturer's specifications. Pipes under pavement must have a minimum of 12 inches of cover from the exterior crown of the pipe to the bottom of the roadway base. Pipes must have at least 6 inches of clearance between the exterior of the pipe and all underground utilities.

In situations where the county engineer has reason to suspect that a pipe system may have not been installed properly, the county engineer may require at his discretion, video inspections of pipe systems to be provided at the owner's expense prior to acceptance of the system.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:whitfield-county/zoning/3.1@2026-05-11-41674acb2f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Whitfield County Zoning Ordinance, 3.1. Conveyance Structures | Georgia Commons