Skip to content
Georgia Commons
Menu

Woodbury · Zoning Ordinance

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-4 - ROAD SPECIFICATIONS

Sec. 2-410. Pavement topping.

About this text

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Prime. After the base has been placed, mixed, compacted, shaped, inspected, and accepted, it shall be primed with suitable asphaltic materials as specified in Department of Transportation Specification 412.

(b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with 19 mm Superpaver binder as required for the street type (see Table 2-4-5).

(c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specification 413.

(d) Final topping. Final topping shall consist of a course of 9.5 mm Superpaver asphaltic cement as required for the street type as required (see Table 2-4-5).

History

The history line the source prints at the end of the section.

(Ord. of 5-17-2021(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbury/zoning/2-410@2022-10-28-1ae4223551

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbury Zoning Ordinance, Sec. 2-410. Pavement topping | Georgia Commons