Woodbury · Ordenanza de zonificación
Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-4 - ROAD SPECIFICATIONS
Sec. 2-410. Pavement topping.
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Prime. After the base has been placed, mixed, compacted, shaped, inspected, and accepted, it shall be primed with suitable asphaltic materials as specified in Department of Transportation Specification 412.
(b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with 19 mm Superpaver binder as required for the street type (see Table 2-4-5).
(c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specification 413.
(d) Final topping. Final topping shall consist of a course of 9.5 mm Superpaver asphaltic cement as required for the street type as required (see Table 2-4-5).
Historia
(Ord. of 5-17-2021(1))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.