Skip to content
Georgia Commons
Menu

Berrien County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 54 - SUBDIVISIONS / Article III - MINIMUM DESIGN STANDARDS / Division 1 - GENERALLY

Sec. 54-82. Easements.

About this text

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Utility easements. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 20 feet. Where possible, as determined by the county engineer, water lines shall be located on the west and south sides of streets and sewer and gas lines shall be on the east and north sides. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within the subdivision or phase thereof. All public utilities within the subdivision shall be located on public rights-of-way.

(b) Drainage easements. Drainage easements shall be provided as required by the county engineer after review of the preliminary improvement plans and preliminary plat of the subject subdivision.

History

The history line the source prints at the end of the section.

(Ord. of 9-24-2001, § 5-2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:berrien-county/code/54-82@2010-11-09-83a4956642

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Berrien County Code of Ordinances, Sec. 54-82. Easements | Georgia Commons